Planned maintenance, breakdown response and upgrades
Heating & Cooling Maintenance
Planned and reactive maintenance for heating and cooling plant: routine service, breakdown response, and efficiency upgrades for plant that works but costs too much to run.

- Emergency response
- 24/7
- KSA regions covered
- 4
- Service lines behind it
- 8
How we approach it
Most plant does not fail suddenly. It degrades: a fouled coil here, a slipping belt there, a control loop someone put into hand two summers ago and never put back, until the running cost has quietly doubled and one hot day tips it over.
Planned maintenance catches that drift. Visits are scheduled against an asset list, with condition recorded each time so trends are visible rather than rediscovered at the point of failure.
When something does fail, we answer around the clock across the Kingdom. And where plant is working but inefficient, an upgrade (new drives, better controls, or a coil change) often beats both repair and replacement.

Valve station under service 
Readings taken and logged 
Back in service after overhaul
What we can build to
These ranges cover most of what we make. Duties outside them are reviewed case by case rather than refused on principle.
| Planned maintenance | Scheduled visits against an agreed asset list |
|---|---|
| Reactive response | 24/7 breakdown callout, Kingdom-wide |
| Condition recording | Readings logged each visit so trends are visible |
| Consumables | Filters, belts, refrigerant, water treatment |
| Upgrades | Drives, controls, coil replacement, VFD retrofit |
| Reporting | Written report per visit with recommendations |
Indicative figures. Final specification is confirmed against your duty and a site survey at quotation.
Standards and testing
- Condition readings recorded and retained per asset
- Written report issued after every visit
- Refrigerant handling to recognised practice
How the work runs
The same sequence every time, so you know what happens next and what is expected of you at each stage.
Step 1
Asset survey
Plant listed, condition assessed and criticality agreed, so the schedule reflects what actually matters to your operation.
Step 2
Schedule agreement
Visit frequency and scope set per asset. Not everything needs quarterly attention, and saying so is part of the job.
Step 3
Planned visits
Service carried out to the agreed scope, with readings recorded rather than ticked, and a written report each visit.
Step 4
Reactive response
Breakdown callout around the clock, with the asset history already on file so the engineer arrives informed.
Step 5
Upgrade recommendations
Where the data shows a component is costing more to run than to replace, we say so, with the numbers behind it.
Where it is used
- Chillers and chilled water plant
- Cooling towers
- Air handling units
- Boilers and steam plant
- Compressors
- Refrigeration systems
Equipment for this line
Supplied, installed and maintained as part of the same service.

HVAC Equipment
Water Chillers
Air-cooled and water-cooled chiller packages

Tower Internals & Spares
Fan & Gear Drive Motors
Belt, gear and direct drives, VFD compatible

Duct & Accessories
HVAC Filters
Panel and pleated filters for AHUs and ductwork

Tower Internals & Spares
PVC Fill Media
Film fill packs cut to suit the tower
Asked before you ask
Straight answers to the questions we hear most on this service line.
Do we have to put all our plant on contract?
No. Contract the critical assets and call us reactively for the rest if that suits you better. We would rather cover what matters properly than everything superficially.
What does 24/7 actually mean?
A phone answered by someone who can dispatch an engineer, at any hour, across Jeddah, Riyadh, Dammam and Makkah. Response times vary by location and are agreed in the contract rather than promised generically.
Will you service plant you did not install?
Yes, most of it. We survey first so the schedule reflects the plant's real condition rather than an assumed one.
Other service lines
- Shell & Tube Heat ExchangersThermal design, in-house fabrication, pressure testing and field re-tubing of shell and tube exchangers for process duty.
- Evaporative Condensers & Cooling TowersEvaporative condensers, closed-circuit and open cooling towers sized to the site's real wet bulb, with far lower water use than an open circuit.
- Air-Cooled Condensers & Dry CoolersAir-cooled condensers, evaporators, radiators and dry coolers for sites where water is scarce, expensive, or not worth the treatment burden.
Tell us the load, the site and the timeline.
Send the duty, the site and anything written on the nameplate. An engineer replies with questions first, then a costed proposal.
Plant down right now? Call the breakdown line on +966 53 783 7389, any hour.